Chicken Farm Project
100 m3/h capacity well water treatment done at Hacı Ali Chicken Farm.
1. Step: Raw water is taken from 4 pcs. wells, transfered in to the 100 m3 capacity tank and chlorine dosage is made.
2. Step: The chlorinated water is ventilated and flocculated in gradual setting pool.
3. Step: After setting pool water is transfered into sad and active carbon filters. The water is purified from sediments, organic substances and chemicals.
4. Step: Filtered water is collected in a 1000 m3 capacity stainless steel tank.
5. Step: Water is transfered into another 1000 m3 capacity tank in a village which is far away from 13 km by using a transfer pump.
6. Step: Water is transfered in to 14 pcs. farm's own tanks.
7. Step: Stored waters are passed through cartridge filters then passed through UV systems which are at the entrace of each coop.
8. Step: Also, treated water is transfered to the 2 pcs. fountains in the village and 1 pcs. fountain at the cemetery for usage of village.
(25.10.2010 )